Ballasting
- Joseph Attard
- Mar 5
- 1 min read
(22 December 2024)
Track ballasted and weathered on the village board.
I added pulleys for the signal wires using N gauge handwheels. Each pulley is two handwheels back-to-back to give a rim into which the signal wire (EZ line) can bite. Wires to be added later so they don't get damaged during scenic work.







Comments